Dug to the depth on your plans, hauled off, and backfilled when the walls are up. One crew from start to finish.
Everything Between the Survey Stakes and the Backfill
A basement dig is the first thing on site and everything after it depends on it being right. We work from your plans and your surveyor's stakes, and keep your builder in the loop.
- Locates and layoutBC 1 Call booked, stakes and offsets checked before we start.
- Strip and digTopsoil set aside, then dug to footing depth with clean walls and the right slope for your soil.
- Grade checked by laserSo your forming crew isn't fixing our mistakes.
- Haul-offTrucks scheduled so the street stays clear and neighbours stay happy.
- Backfill and rough gradeOnce the walls, drain tile and membrane are on, we backfill in lifts and slope the ground away.

What Changes the Price of a Basement Dig
We'd rather explain it now than surprise you later.
Truckloads
A typical 40 × 30 ft basement 8 ft deep is around 45–50 loads.
Soil and rock
Clay, till and boulders slow the dig. We'll tell you what we expect after seeing the site.
Groundwater
A high water table can mean pumping. Common in low parts of Surrey and Delta.
Access
Tight infill lots next to neighbours take more care than an open acreage.
Builders: We Show Up on the Day You Booked
Your forming crew is booked behind us, so a late dig costs you money. We give you a date, show up on it, and call you if weather changes anything.
We also do the follow-up work: perimeter drain tile, sewer and water connections, backfill and final grade. One call instead of three subcontractors.

Basement Dig Questions
How long does a basement dig take?
Most house basements are dug in one to three days, depending on size, soil and how fast trucks can get in and out. We'll give you the expected days in the quote.
Can you dig a basement under an existing house?
Lowering or adding a basement under an existing home needs an engineer and underpinning. We do the digging part with the right contractor and plans in place.
Do you keep the topsoil?
If you want it, yes. We strip it first and stockpile it on site for your landscaping later.
Do you do the backfill too?
Yes. Once the foundation, drain tile and damp-proofing are done and inspected, we come back to backfill and rough grade.